KP Green Engineering Dispatches First Heavy Engineering Product for Chennai Metro

KP Green Engineering dispatches first Rail Over Bridge structure for Chennai Metro from its Matar heavy engineering facility
KP Green Engineering successfully dispatches its first Rail Over Bridge structure for Chennai Metro, showcasing full operational readiness of the Matar heavy engineering facility and the company’s capability to deliver complex metro and railway infrastructure components.

KP Green Engineering Limited has achieved a major milestone with the successful execution and dispatch of its first heavy engineering product, a Rail Over Bridge (ROB) structure, for the Chennai Metro.

The announcement was made in accordance with Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.

The ROB structure has been fully designed, engineered, and manufactured at the company’s newly launched Matar facility, showcasing KP Green Engineering’s technical capability to deliver complex and large-scale steel structures tailored for metro and railway infrastructure.

This accomplishment not only confirms that the Matar facility is fully operational but also signals steady progress toward complete capacity utilization. The successful dispatch reinforces the company’s strategic expansion into the heavy engineering segment, strengthening its product portfolio and positioning it to contribute significantly to major national infrastructure development programs.

The company has also released a dispatch video of the first ROB girder for public viewing on their youtube channel.

Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *